Hydros received a late call yesterday about a boat lift failure in Lighthouse Point. Our crew was quickly assembled and ready to help our out of town client. With late evening tides, our crew was able to get the boat off the lift and safely along the dock by 1am. We are very proud to have helped.
Recent Posts
- New EZ Dock Floating Dock – Floating Docks – Dock Construction – Fort Lauderdale, FL October 9, 2024
- New Dock – New Seawall – Raised Seawall Cap – Raise My Seawall – Fort Lauderdale, FL October 2, 2024
- New Boat Lift Bunks – Boat Lift Installation – Boat Lift Repair – Boat Lift Maintenance September 30, 2024
- Fort Lauderdale Raised Seawall – Owens Corning WearDeck Dock – Update September 26, 2024
- Faro Boat Lifts 15k Elevator Lift – Boat Lift Installation September 24, 2024
- New Dock – New Seawall – Fort Lauderdale, FL September 13, 2024
- Seawall Repair – Seawall Resealing – Seawall Cleaning – No More Soil Loss September 11, 2024
- New Pompano Beach Concrete Seawall – Update – Seawall Construction – Pompano Beach Seawall Construction September 9, 2024
Categories
- Boat Lifts (37)
- Docks & Pilings (101)
- Seawall Construction (17)
- Seawall Inspections (32)
- Seawall Maintenance (166)
- Seawall Repair (168)
- Seawall Restoration (145)